What's EMR
Solutions
Solutions
Architect & Interior Design FirmsSchools and Pre-schoolsFacilities / HSEHomeowners / Parents
Get started
Request an EMR auditEvidence centreKnowledge centre
How it works
Evidence
Resources
About
Book an audit
Nanorama Technologies Pvt. Ltd.
447/A, 9th Cross, 2nd Phase, JP Nagar
Bengaluru 560078, India
+91 9916 911 911
contact@livesafe.in
UAE
Representative sales office
Villa 1, Complex 69, Opposite Shamma Supermarket
Al Oraibi, Ras Al Khaimah
United Arab Emirates
What's EMR
What is EMRSources & infrastructureMeasurement scienceStandards
Solutions
Architect & Interior Design FirmsSchools and Pre-schoolsFacilities / HSEHomeowners / Parents
Company
AboutHow it worksEvidenceResourcesCase studiesFAQs
© 2026 Nanorama Technologies Pvt. Ltd.
Privacy PolicyCookie Policy
LiveSAFE
Solutions / Facilities / HSE
Architect & Interior Design FirmsSchools and Pre-schoolsFacilities / HSEHomeowners / Parents
For workplace, HSE and facilities teams

RF baselines your HSE team can stand behind.

Workstation-level measurement mapped to ICNIRP and Building Biology guidance, packaged for wellness, ESG and WELL reporting.

Request an EMR auditUnderstand exposure
Floor 4, Bay C
312 workstations measured
Median 180 µW/m² · post-mitigation
Trusted byPrestige ConstructionsGayathri & Namith Architects
ICNIRP 2020SBM-2015WELL v2NABL-traceable instruments

What the audit gives your team

01
Baseline

We measure every desk so you know exactly where exposure is higher and where it is not.

Specification

Spot and logged RF measurements (700 MHz to 6 GHz) plus ELF magnetic field at seated head height, gridded per workstation.

02
Prioritised plan

You get a short list of changes, starting with the ones that help the most people.

Specification

Remediation ranked by occupancy hours × measured level; AP relocation, cable separation and selective shielding specified.

03
Reportable

The report is ready to hand to auditors, wellness programmes and leadership.

Specification

Report structured for WELL v2 and ESG disclosures, with instrument calibration certificates and point references.

Where we measure on a floor

Readings follow how the floor is actually occupied, not just where the hardware is.

Open-plan office floor with measurement points over each desk, linked by a dashed survey grid on the carpetOffice ceiling with four Wi-Fi access points whose signal rings overlap above the desksMeeting room with signal rings from the conferencing display, speaker and presentation puck, and a cutaway of the wall showing the shielding layerElectrical room with field lines from the distribution boards and UPS stopping at a shielded wall beside the office floor
1 · Open workstations

Scoped to your campus

01Week 1
Floor baseline
Measurement across floors and workstations, logged against your floor plates.
Exposure heat map by floor
Source inventory
02Weeks 2 to 3
Remediation plan
Changes ranked by occupancy, coordinated with IT so connectivity holds.
Ranked action list
AP and cabling recommendations
03After works
Verification
Re-measured at the same points with the same instrument.
Before and after report
Signed verification certificate
Benchmark

Before and after, room by room

Readings in the treated rooms fell by 72% to 88%, measured with the same meter at the same points.

See the room-by-room readingsTechnical detail, for those who want it
RF power density · µW/m²
ZoneBeforeAfterChange
Open-plan bay2,200260−88%
Meeting room1,650300−81%
Reception1,400380−72%
Server corridor3,900900−76%
Representative values from a multi-floor IT campus audit in Bengaluru. Your report uses your own readings, logged against marked points on your plan.
Applications

Where we intervene.

Interventions follow measured conditions, never blanket fixes. These are the four parts of a space we work on most.

Glass office tower at dusk with the floors lit from insideWindow film · glazing
01

Windows & façades

RF-attenuating window film and glazing details for façades facing towers and base stations, specified to your drawings and invisible once fitted.

Worker painting an interior wall of an unfinished office floorWall type W-04
02

Walls & partitions

Shielding primers and partition assemblies applied before the finish coat, for party walls, bedrooms and nurseries. No visible change to the finished space.

Engineer in a hard hat checking wiring on a control panelRouters · access points
03

Wireless infrastructure

Router and access-point placement, schedules and hardwiring, coordinated with your IT team so connectivity holds exactly where it is needed.

Open-plan office with employees at their workstationsRanked by occupancy
04

High-occupancy areas

Bedrooms, classrooms and workstations come first: every change is ranked by occupancy hours × measured level, where people spend the most time.

LiveSAFE™ protection products

Invisible materials. Measured results.

Three shielding materials, each chosen from your audit readings and fitted by LiveSAFE engineers.

See all products →
LiveSAFE LS Coating, 5 litre can01 / 03Walls & ceilings

LS Coating

Patented* shielding coating, applied beneath your usual paint finish.

99.9%
EMR reduction, up to
Rolls of LiveSAFE specially treated window film02 / 03Windows & glazing

Specially Treated Film

Shielding film for glass that also blocks up to 99% of UV radiation.

99.9%
EMR reduction, up to
Roll of LiveSAFE specially treated shielding mesh03 / 03Windows & openings

Specially Treated Mesh

Fine shielding mesh with an aesthetically appealing finish.

99.999%
Attenuation, up to

* Patent details available on request. Figures are the maximum reduction measured under test conditions; results in your space depend on the source and the installation.

Case studies

View the evidence →
SKH Group · Emaar Capital One, Gurugram
Full signal bars, no connection: an office floor recalibrated
Mesh roller blinds and wall coating across ten workstations. The worst desk fell from 72,360 to 981 µW/m², every desk now reads under 1,000 µW/m², and connectivity improved.
Bosch · Koramangala, Bengaluru
Workstation floors beside mobile towers
Mesh, film and coating on the workstation zones and the terrace. Readings of up to 80,500 µW/m² were cut by more than 98%, validated by RVCE, with connectivity kept.

White papers

Free. Tell us where to send them and they arrive by email.

PDF white paper

The Future of Cognitive Ergonomics

How EMFs and RF-EMR influence workplace focus, productivity and occupational health, with a radiation-aware design framework.

PDF white paper

Safe, Functional & Accessible 5G Inbuilding Solutions

What 5G means for your building: common in-building issues, interference, health concerns and rolling 5G out with LiveSAFE.

PDF white paper

5G and In-Building Solutions

The pain areas (high exposure, dark spots, interference, too many access points) and how to solve them as 5G rolls out.

Scope a workplace audit

Tell us the floor area and headcount. We will return a measurement plan and quote within two working days.

Request an EMR auditUnderstand exposure
Planning a project?Book a consultation