LiveSAFE / How it works

Six stages. One documented process.

From the first calibrated reading to ongoing monitoring, every stage is measured, explained and documented, so you always know what changed and why.

01
Technician measuring with a spectrum analyser
You receiveReadings log

EMR audit

We measure before anyone recommends anything.

More detailsTechnical detail, for those who want it

A LiveSAFE specialist visits with calibrated, multi-axis instruments and records RF and ELF readings at marked points across every priority room, floor and façade, inside and outside.

  • Calibrated RF and ELF meters
  • Readings at marked points on your plan
  • Internal and external sources
02
Source map overlaid on a floor plan
You receiveAudit report

Analysis & reporting

Readings become a clear picture of your space.

More detailsTechnical detail, for those who want it

We identify sources, patterns and priority areas, and model exposure against how the space is actually used, reported against both ICNIRP limits and Building Biology precautionary guidance.

  • Sources mapped on your floor plan
  • ICNIRP and Building Biology references
  • Plain-language summary
03
Interventions specified on architectural drawings
You receiveRecommendation plan

Recommendations

Practical, ranked, and only where required.

More detailsTechnical detail, for those who want it

We specify interventions based on measured conditions: router placement, schedules, hardwiring, shielding and layout changes, ranked by occupancy hours and measured level. No blanket solutions.

  • Ranked by exposure × occupancy
  • Connectivity kept where it’s needed
  • Specification for your team or contractor
04
Shielding primer applied before the finish coat
You receiveInstallation record

Installation

Proprietary solutions, invisible once finished.

More detailsTechnical detail, for those who want it

Where required, we install LiveSAFE solutions such as shielding primers, window film and partition treatments, with no visible change to finishes and no loss of connectivity where you need it.

  • Certified installation
  • No change to finishes or façades
  • Coordinated with your IT and site teams
05
Verification report on a tablet
You receiveVerification report

Post-installation verification

Same meter. Same points. A documented result.

More detailsTechnical detail, for those who want it

We re-measure with the same instrument at the same marked points, so before and after are directly comparable, and sign off a report you can hand to a board, a parent body or an auditor.

  • Like-for-like re-measurement
  • Before-and-after comparison
  • Signed verification report
06
Occupied office floor
You receiveMonitoring log

Ongoing monitoring

Spaces change. We keep them measured.

More detailsTechnical detail, for those who want it

Devices, layouts and nearby infrastructure change over time. Periodic re-checks keep your wireless environment where it should be, with every reading logged against the original baseline.

  • Scheduled re-checks
  • Logged against your baseline
  • Same calibrated instruments every time
Stage 01 starts here

Start with a
measured baseline.