What's EMR
Solutions
Solutions
Architect & Interior Design FirmsSchools and Pre-schoolsFacilities / HSEHomeowners / Parents
Get started
Request an EMR auditEvidence centreKnowledge centre
How it works
Evidence
Resources
About
Book an audit
Nanorama Technologies Pvt. Ltd.
447/A, 9th Cross, 2nd Phase, JP Nagar
Bengaluru 560078, India
+91 9916 911 911
contact@livesafe.in
UAE
Representative sales office
Villa 1, Complex 69, Opposite Shamma Supermarket
Al Oraibi, Ras Al Khaimah
United Arab Emirates
What's EMR
What is EMRSources & infrastructureMeasurement scienceStandards
Solutions
Architect & Interior Design FirmsSchools and Pre-schoolsFacilities / HSEHomeowners / Parents
Company
AboutHow it worksEvidenceResourcesCase studiesFAQs
© 2026 Nanorama Technologies Pvt. Ltd.
Privacy PolicyCookie Policy
LiveSAFE
Solutions / Architects
Architect & Interior Design FirmsSchools and Pre-schoolsFacilities / HSEHomeowners / Parents
For architects

Design for connectivity. Specify for calm.

Integrate EMR management at pre-construction, invisible in the finished space, and documented in the formats your team already uses.

Request an EMR audit
Wall type W-04
Shielding primer beneath finish coat
≥ 35 dB · 1 to 6 GHz
Trusted byBrigade GroupKembhavi Architects
ICNIRP 2020SBM-2015WELL v2NABL-traceable instruments

Three principles behind every specification

01
Invisible

The protection sits under the paint and on the glass. Nothing changes in the photographs of your project.

Specification

Carbon-based shielding primer (≥ 35 dB, 1 to 6 GHz) under standard emulsion; RF film on glazing with edge sealing; earthed per IS 3043.

02
Connected

We plan where signal should go rather than blocking it. Wi-Fi and phones still work where people need them.

Specification

Access-point placement and RF-transparent apertures modelled against the shielded envelope; target RSSI ≥ −67 dBm in work zones.

03
Documented

You get drawings and schedules your team and contractors already know how to use.

Specification

Layer details, sections and schedules issued as DWG, RVT and PDF, coordinated with MEP and façade consultants.

Where it goes in the building

Shielding is targeted at the zones where people spend the longest, not applied everywhere.

Bedroom with a cutaway of the wall and ceiling showing the LS Coating layer beneath the paint, stopping signal from a nearby towerVilla bedroom glazing facing a cell tower at sunset, with RF window film peeling back from the glassOpen-plan living room with the router and ceiling access points placed away from the seating, coverage shown as soft ringsOpen distribution board and cable riser beside a bedroom, with a shielded wall layer keeping the field out of the bedroom
1 · Sleeping zones

From site survey to signed verification

01Pre-construction
Site RF assessment
We survey the plot and neighbouring infrastructure, then overlay sources on your site plan.
Source map on site plan
Exposure baseline by façade
02Design development
CAD / BIM integration
Shielding assemblies issued as layered details and coordinated with MEP and IT consultants.
DWG / RVT / IFC details
Material schedule & spec text
03Handover
Verification
Post-installation measurement at the same points, documented for your client file.
Before / after report
Signed verification certificate
Benchmark

Before and after, room by room

Readings in the treated rooms fell by 59% to 99%, measured with the same meter at the same points.

See the room-by-room readingsTechnical detail, for those who want it
RF power density · µW/m²
ZoneBeforeAfterChange
Master bedroom2,92,100729−99%
Guest bedroom2,90,300669−99%
Dining2,61,7001,270−99%
Children's room2,61,300558−99%
Bedroom 32,11,900432−99%
Living hall90,4501,907−97%
Kitchen40,6501,118−97%
Foyer2,402967−59%
Representative values from a real case study of a large multi-bedroom home, measured before and after treatment. Your report uses your own readings, logged against marked points on your plan.
Applications

Where we intervene.

Interventions follow measured conditions, never blanket fixes. These are the four parts of a space we work on most.

Glass façade of a modern building with projecting balconies against a blue skyWindow film · glazing
01

Windows & façades

RF-attenuating window film and glazing details for façades facing towers and base stations, specified to your drawings and invisible once fitted.

Plasterer smoothing a wall with a steel floatWall type W-04
02

Walls & partitions

Shielding primers and partition assemblies applied before the finish coat, for party walls, bedrooms and nurseries. No visible change to the finished space.

Mobile network tower with antenna panels rising against a blue skyRouters · access points
03

Wireless infrastructure

Router and access-point placement, schedules and hardwiring, coordinated with your IT team so connectivity holds exactly where it is needed.

Tall residential apartment block at dusk with its windows litRanked by occupancy
04

High-occupancy areas

Bedrooms, classrooms and workstations come first: every change is ranked by occupancy hours × measured level, where people spend the most time.

LiveSAFE™ protection products

Invisible materials. Measured results.

Three shielding materials, each chosen from your audit readings and fitted by LiveSAFE engineers.

See all products →
LiveSAFE LS Coating, 5 litre can01 / 03Walls & ceilings

LS Coating

Patented* shielding coating, applied beneath your usual paint finish.

99.9%
EMR reduction, up to
Rolls of LiveSAFE specially treated window film02 / 03Windows & glazing

Specially Treated Film

Shielding film for glass that also blocks up to 99% of UV radiation.

99.9%
EMR reduction, up to
Roll of LiveSAFE specially treated shielding mesh03 / 03Windows & openings

Specially Treated Mesh

Fine shielding mesh with an aesthetically appealing finish.

99.999%
Attenuation, up to

* Patent details available on request. Figures are the maximum reduction measured under test conditions; results in your space depend on the source and the installation.

Case studies

View the evidence →
Nagarjuna Apartments · Marathahalli, Bengaluru
Fourth-floor apartment 20 m from a cell tower
Shielding coating on the walls, mesh and film on the windows. The kids' room fell from 96,550 to 927 µW/m², a 99% reduction.
SKH Group · Emaar Capital One, Gurugram
Full signal bars, no connection: an office floor recalibrated
Mesh roller blinds and wall coating across ten workstations. The worst desk fell from 72,360 to 981 µW/m², every desk now reads under 1,000 µW/m², and connectivity improved.

White papers

Free. Tell us where to send them and they arrive by email.

PDF white paper

The Future of Cognitive Ergonomics

How EMFs and RF-EMR influence workplace focus, productivity and occupational health, with a radiation-aware design framework.

PDF white paper

Safe, Functional & Accessible 5G Inbuilding Solutions

What 5G means for your building: common in-building issues, interference, health concerns and rolling 5G out with LiveSAFE.

PDF white paper

5G and In-Building Solutions

The pain areas (high exposure, dark spots, interference, too many access points) and how to solve them as 5G rolls out.

Specification library

Layer details, sections and material schedules for common shielding assemblies. Free for registered practices.

Shielding primer wall type W-04
Masonry and drywall, under paint or plaster
DWG · RVT
RF window film detail
Glazing section with edge-sealing detail
DWG · PDF
Shielded partition assembly
Bedroom and nursery partitions, metal stud
RVT · IFC
Shielding fabric canopy
Ceiling-mounted bed canopy fixing detail
DWG
Material schedule template
Quantities and specification clauses
XLSX · DOCX
We email the white papers now, and our team follows up with the drawing files.

Bring us in at drawings stage

Share your plans and programme. We will return a scoped site assessment and a fee proposal.

Request an EMR auditUnderstand exposure
Planning a project?Book a consultation